info@c1sinc.com
  • Home
  • Services
    • MEP Engineering
    • LEED Industrial & Manufacturing
    • Cleanroom Design Build
    • Sustainability Consulting
    • Construction Management
    • Energy Management
  • Leadership
  • Projects
    • Testimonials & Video
    • Client List
    • LEED Certification Projects
    • Clean Manufacturing Projects
    • Process Manufacturing Projects
  • Contact Us
    • Contact Information
    • Employment
  • Client Log-in

Clean Manufacturing Project Listing         pdf

mary kay_logo

 

MARY KAY COSMETICS - Dallas, Texas

orange

2011: Verification of as-built conditions for the site compressed air system

 
 
st. jude medical_logo

ST. JUDE MEDICAL - Plano, Texas

orange

2004: 20,000 sf, ISO 7/8 medical device manufacturing cleanroom design and construction management

orange

2011: Clean environment monitoring system design for FDA compliance

orange

2011: Retro-commissioning support for cleanroom HVAC systems for FDA compliance

orange

2012: Design of “Clean-Zone” for reduction of contamination

orange

2012: Design of interlocks for pressure control

 
 
reckitt benckiser_logo

RECKITT BENCKISER – Fort Worth, Texas

orange

2006: V-Blender design and installation

orange

2006: Drying oven design and installation

orange

2008: Hazardous material dust control system design and installation

orange

2011: Facility as-built verification for FDA compliance

orange

2012: Design of “Clean-Zone” for reduction of contamination

orange

2012: Design of interlocks for pressure control for ISO compliance

orange

2012: Differential pressure testing and facility recommendations for FDA compliance

 
 
l3 logo

L-3 COMMUNICATIONS – Garland, Texas

orange

2011: 15,000 sf, ISO7/IS05 cleanroom design

orange

2011: Emergency backup power for critical clean manufacturing system

orange

2011: Deionized water system upgrade for critical clean manufacturing process enhancement

orange

2011: ADA compliance upgrade for “Clean-Zone” restrooms and smock/gowning area

orange

2011: HVAC system design including makeup pressurization air, recirculation air, humidification, and cooling

orange

2011: Clean manufacturing systems design for process equipment

 
 
stion corporation_logo

STION CORPORATION – Hattiesburg, Mississippi

orange

2011: Design of mechanical and process systems for a clean manufacturing facility

orange

2011: Site support during installation to meet critical compliance deadline

 
 
raytheon company_logo

RAYTHEON – Lemmon Avenue, Dallas, TX

orange

2009: MEP design for HVAC system for manufacturing area

orange

2009: MEP design for cooling tower replacement (temporary cooling towers layout, piping modifications to support new installation)

orange

2011: Clean manufacturing upgrade for relocation of new product group including chemical lab and DI water distribution overhaul for strict specification compliance

orange

2012: Chiller change-out design and construction oversight for critical system backup

C1S Engineering Sustainable Solutions | 4231 Sigma Rd., Suite 110 Dallas, TX 75244 | Phone: (972) 386-7005