Clean Manufacturing Project Listing 
|
MARY KAY COSMETICS - Dallas, Texas |
|
|
2011: Verification of as-built conditions for the site compressed air system |
||
![]() |
ST. JUDE MEDICAL - Plano, Texas |
|
|
2004: 20,000 sf, ISO 7/8 medical device manufacturing cleanroom design and construction management |
||
|
2011: Clean environment monitoring system design for FDA compliance |
||
|
2011: Retro-commissioning support for cleanroom HVAC systems for FDA compliance |
||
|
2012: Design of “Clean-Zone” for reduction of contamination |
||
|
2012: Design of interlocks for pressure control |
||
![]() |
RECKITT BENCKISER – Fort Worth, Texas |
|
|
2006: V-Blender design and installation |
||
|
2006: Drying oven design and installation |
||
|
2008: Hazardous material dust control system design and installation |
||
|
2011: Facility as-built verification for FDA compliance |
||
|
2012: Design of “Clean-Zone” for reduction of contamination |
||
|
2012: Design of interlocks for pressure control for ISO compliance |
||
|
2012: Differential pressure testing and facility recommendations for FDA compliance |
||
![]() |
L-3 COMMUNICATIONS – Garland, Texas |
|
|
2011: 15,000 sf, ISO7/IS05 cleanroom design |
||
|
2011: Emergency backup power for critical clean manufacturing system |
||
|
2011: Deionized water system upgrade for critical clean manufacturing process enhancement |
||
|
2011: ADA compliance upgrade for “Clean-Zone” restrooms and smock/gowning area |
||
|
2011: HVAC system design including makeup pressurization air, recirculation air, humidification, and cooling |
||
|
2011: Clean manufacturing systems design for process equipment |
||
![]() |
STION CORPORATION – Hattiesburg, Mississippi |
|
|
2011: Design of mechanical and process systems for a clean manufacturing facility |
||
|
2011: Site support during installation to meet critical compliance deadline |
||
![]() |
RAYTHEON – Lemmon Avenue, Dallas, TX |
|
|
2009: MEP design for HVAC system for manufacturing area |
||
|
2009: MEP design for cooling tower replacement (temporary cooling towers layout, piping modifications to support new installation) |
||
|
2011: Clean manufacturing upgrade for relocation of new product group including chemical lab and DI water distribution overhaul for strict specification compliance |
||
|
2012: Chiller change-out design and construction oversight for critical system backup |
||